90-Day Manufacturing Pilot Proposal
Prove the value on your production floor. One production line, incoming inspection, measurable results.
Scope
What the Pilot Covers
The pilot targets one production line's incoming inspection process. We work with your existing inspection plan and quality data to measure the impact of QLM's optimized check selection against your current 100% inspection approach.
This is not a proof-of-concept on simulated data. It is a controlled evaluation on your production parts, producing results that your quality engineering and production management teams can independently verify.
What We Measure
Timeline
Success Criteria
We define success in advance so there is no ambiguity about whether the pilot delivered value. These thresholds are negotiable before the pilot starts, but fixed once it begins.
| Metric | Threshold | How Measured |
|---|---|---|
| Inspection Time Reduction | ≥ 60% fewer checks at equivalent quality confidence | Mean checks executed in treatment vs. control, at matched quality confidence threshold |
| Defect Escape Rate | Zero increase in defect escapes | End-of-line 100% inspection catch rate on treatment lots vs. control lots |
| Operator Cert Throughput | ≥ 50% reduction in certification time | Hours to certify operators using adaptive vs. fixed-form assessment |
| Safety Coverage | 100% OSHA compliance maintained | All required safety checks completed per 30-day rolling period |
Pilot Pricing
The pilot is designed to be zero-risk. You pay nothing until the pilot is complete and you have independently verified the results. Production pricing is based on inspection volume and is detailed in the ROI Model.
What We Need From You
- 1 Inspection Library — Your quality inspection check definitions in the format described in the Integration Guide. JSON, CSV, or JSONL. Minimum 50 checks; recommended 200+ for robust calibration.
- 2 Inspection Result Feed — Real-time submission of check results (check_id, pass/fail, measured value, execution time) via the API as inspections complete during the pilot period.
- 3 One Technical Contact — A quality engineer who can implement the API integration and troubleshoot during the integration phase. Expected time commitment: 2-4 hours total.
- 4 Validation Data — Full 100% inspection results for treatment-group lots at end-of-line, so we can validate that optimized inspection did not miss real defects.
Start Your Pilot
Request a sandbox key and we will schedule a 30-minute kickoff to scope your pilot.
Request Sandbox Access